This is one of the dams we built, it holds about 20megelitres (20 * 1,000,000 liters) it was an old 1meter deep silted up dam, we took about 2 meters of silt out and then hit murum/Gravel. We then used this for building about 6km of road and ended up with a nice big dam in a catchment. It is about 6 to 8 meters deep.
Joseph our excavator driver only opened it back up to the inlet about 5 days earlier and it filled in two days. (it is on a small creek/waterway)
We also had built another dam near our workshop of about half the surface area and the same depth which is chocka. (that is really full in Australian)
Joseph our excavator driver only opened it back up to the inlet about 5 days earlier and it filled in two days. (it is on a small creek/waterway)
We also had built another dam near our workshop of about half the surface area and the same depth which is chocka. (that is really full in Australian)